Tag: buildingcontrol

Building Control

Building Control: Things You Should Know

Below is about building regulations and the things you should know. 

Why do we have Building control?  

The building control service is to ensure the health and safety in a built environment. They cover a lot such as stability of the building, insulation, ventilation, fire protection and fire escape. However, there are other precautions they take as well. Depending on the project you may be spared from some regulations however, you should always follow and comply with the building regulations. Building regulations will apply if you’re wanting to: 

  • Build a completely new property. 
  • Extend or change existing property. 
  • Provide services in a property.  

Building control regulations  

  • A: Structure  
  • B: Fire safety  
  • C: Site preparation and resistance to contaminants and moisture 
  • D: Toxic substances  
  • E: Resistance to the passage of sound 
  • F: Ventilation 
  • G: Sanitation, hot water safety and water efficiency  

Part A: Structure  

Firstly, this regulation requires that the building is structurally safe and stable. Part A stipulates design standards for use on all buildings and gives simple design rules. 

Part B: Fire safety  

This covers all fire measures to keep the people in the building safe. In addition, the requirements cover escape, fire detection and warning systems. There are other requirements that need to be followed under fire safety.  

Part C: Site preparations and resistance to contaminants and moisture. 

Includes weather and water tightness of buildings, subsoil drainage, site preparation and measures to deal with contaminated land and all other site related hazardous and dangerous substances. 

Part D: Toxic substances 

Finally, the control of hazards from toxic chemicals used in insulation.  

What happens if you fail to comply with building regulations? 

If you fail to follow the building control regulations your local authority has the duty to take action. For example, by taking you to magistrate’s court. Your local authority can also make you demolish your work. Usually but not always the builder, installer or main contractor would have action against them. You can be prosecuted for up to two years after the completion of the project. 

Difference between building control and planning  

Building regulations sets safety standards for the construction of buildings. These requirements cover fire safety, health, fuel and power. Whereas, planning is seeking permission to do building works. The planning requirements are to make sure your plans do not affect you, your neighbours or the environment. Both have more requirements that need to be followed. These are separate processes. 

Picture: Getty

Contact us

Advice Center

Everything to know about building control and building regs.

What is building control? 

Firstly, local authority building control teams help people comply with the building regulations. They do this by giving feedback on plans and providing site inspections.  

What are building regulations? 

Building regulations are the legally enforceable rules describing the minimum standards to which buildings must be designed and built, with the objective of keeping people healthy and safe.  

The difference between building regs and building control –  

Many homeowners commonly don’t understand the difference between building regulations and building control. However, it is important to know the difference. So, that you are informed and are able to understand more technical conversations when it comes to your project.  

The difference between the two is that building regulations are the building standards, and building control is the function of enforcing those standards. It’s the job of a building control inspector to assess whether or not a project complies with building regulations.  

Why is building control important?  

Building regs are there to protect people’s safety, health, and welfare in and around buildings. The regulations are also designed to improve the protection of fuel and power. And also protect and enhance the environment and promote sustainable development.  

What happens if you do work without approval?  

The local authority has to see that building work complies with the regulations. If you don’t get approval, you may be asked to alter or remove it. So, if you fail to do this, the local authority may serve a notice requiring you to do so within 28 days, and you will be liable for the costs.  

If you are convicted, you may need to pay a penalty of £5,000 plus £50 for each day. In addition, if you do not fix the work the authority has the power to get the cost from you.   

How long does building control last?  

The approval of building plans lasts for three years. So, if you don’t start work in that time the local authority may serve you with a notice declaring your plans of no effect. This means you will have to submit a fresh application.